Total specialist maintenance has recently been awarded a Carbon fibre strengthening scheme to a concrete footbridge that is adjacent to a railway crossing that requires structural enhancement. The works required are as follows Concrete repairs to the parapet wall and concrete soffit using sika 615 concrete repair mortar Installation of Sika Carbodur NSM rod BC12 […]