A structure required the top 150mm of the concrete walls removing due to the concrete having insufficient cover of the reinforcement, the levels not being right for the new tank roof and had deteriorated due hydro sulphide attack.
Total specialist provided directly employed operatives trained to undertake the hydro demolition works which involved removing the top 150mm of concrete from the top of the structure walls.