A major supermarket client had some brick constructed and concrete manholes that were suffering from significant water ingress which were causing them operational issues as well major pumping costs due to the ground water ingress
The works involved carrying out the following:
Providing confined spaced trained operatives to city and guild standard
Carrying out resin injection to the areas of infiltration
Carrying out concrete repairs to defective areas
Carrying out waterproof tanking to the benching and manhole walls